Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Al-Khalil, M I and Al-Ghafly, M A (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(05), 647-55.

Bon, R, Birgonul, T and Ozdogan, I (1999) An input-output analysis of the Turkish construction sector, 1973-1990: a note. Construction Management and Economics, 17(05), 543-51.

Chen, J J and Chambers, D (1999) Sustainability and the impact of Chinese policy initiatives upon construction. Construction Management and Economics, 17(05), 679-87.

Gunner, J and Skitmore, M R (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(05), 635-46.

Lam, K C and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(05), 589-602.

Lo, W, Krizek, R J and Hadavi, A (1999) Effects of high pre-qualification requirements. Construction Management and Economics, 17(05), 603-12.

Loosemore, M (1999) International construction management research: cultural sensitivity in methodological design. Construction Management and Economics, 17(05), 553-61.

Low, S P and Hui, M S (1999) The application of JIT philosophy to construction: a case study in site layout. Construction Management and Economics, 17(05), 657-68.

Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(05), 669-77.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(05), 577-87.

  • Type: Journal Article
  • Keywords: productivity rates; in situ concrete work; resource Utilization; construction methods; high rise construction
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461999371196
  • Abstract:

    Research among European countries had confirmed variance in productivity rates ascribed by construction planning engineers for identical operations. Similar differences in planned construction resource/method factors also had been identified. It is hypothesized that such variance may be due to differences in contractor preference, resulting from socio-economic and corporate objective impacts. Analysis of variance and correlation tests are used to examine this hypothesis on data obtained from French, German and UK contractors. Numerous construction resource/method factors are tested for their impact on mean productivity rates for principal high rise in situ concrete construction operations. Significant productivity rate variations are identified for reinforcement fixing and formwork erection, while variance in concrete placing productivity rates are not found to be dependent upon construction resource/method factors. Contractors seeking to improve productivity might wish to consider solutions for construction resource/method decisions that have been found herein to be related to higher productivity rates and (in some cases) lower costs.

Ranasinghe, M (1999) Private sector participation in infrastructure projects: a methodology to analyse viability of BOT. Construction Management and Economics, 17(05), 613-23.

Tse, R Y C, Ho, C W and Ganesan, S (1999) Matching housing supply and demand: an empirical study of Hong Kong' s market. Construction Management and Economics, 17(05), 625-33.

Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(05), 563-76.